Fiber route design for data center and middle-mile developers

Local knowledge of the ground between Memphis, Southaven and West Memphis, where a route can cross two state lines and a river.

Data center development has arrived in the Memphis area at a scale the region has not seen before, and every site needs multiple physically diverse fiber routes. Those routes have to get across rivers, railroads, levees and state lines.

We are based here. We provide the outside-plant side of that work: finding routes that can actually be permitted and built, and producing the drawings to do it.

What you are up against

The constraints that shape the work

  • Diversity that is real

    Two routes that share a bridge, a rail corridor or a duct bank are not diverse. It takes GIS analysis and field checks to prove separation.

  • Crossing lead times

    Railroad, river and levee approvals are slow. A route that avoids one can save months.

  • Three states at once

    Tennessee, Mississippi and Arkansas each have their own DOT rules and local authorities.

How we help

What we put first

  • Feasibility before commitment

    Candidate routes compared on distance, constructability and permitting risk.

  • Crossings started first

    Long-lead permits identified and submitted at the start, not discovered in the middle.

  • Plan sets for construction

    Plan and profile, conduit and handhole detail, and material takeoffs.

Next step

Talk to the people who lead the work

Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.