Field technician measuring attachment heights on a utility pole with a height stick.

Service 02 / Fielding

Pole surveys and OSP fielding with Katapult

Field data collected once, collected properly, and connected to the design it has to support.

Our pole survey and base mapping process bridges the gap between high-level strategy and low-level precision. It captures real-world conditions to validate design assumptions and to prepare for permitting and pole loading analysis.

Before anyone goes to the field, we identify the permitting authorities and pole owners in the project area and engage them early, so we understand the engineering specifications and constraints that will shape the build, and collect what they will ask for.

What's included

Scope

  • Digital pole surveys

    Comprehensive pole data collected with the Katapult system: attachments, heights, equipment, guying and condition.

  • Base mapping

    Field-verified routes, structures and obstacles that the design can rely on.

  • Underground route staking

    The proposed buried route walked and staked in the field, with handhole, vault and bore locations marked and conflicts recorded.

  • Pole-owner requirements up front

    We confirm what each owner and permitting authority needs before collection starts, to avoid second trips.

  • Direct handoff to design

    Survey data feeds straight into our integrated design pipeline. Nothing is re-keyed.

Why it matters

Field data is where schedules are won or lost

A design built on assumptions gets redesigned when the field disagrees. Chris started his career as a cable lineman, and that experience shapes what we look for on a pole and along a route: the things that are cheap to notice on a survey and expensive to discover during construction.

Because all phases of design and verification are connected, redesigns caused by field conditions flow cleanly through GIS, CAD and splice planning. That eliminates the disconnects common in traditional workflows and keeps accuracy from field to final plan.

Gloved hands holding a fiberglass height stick against a wooden pole.

Underground

Underground routes are staked, not drawn from a desk

On underground routes, fielding means staking. We walk the proposed route and mark it on the ground: the path, handhole and vault locations, and bore entry and exit points. Along the way we record what a desk design cannot see, such as driveways, ditches, culverts, fences and signs of other buried utilities.

The staked route comes back as design data, so the drawings and permit submittals match what was marked in the field.

Deliverables

What you receive

Next step

Talk to the people who lead the work

Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.