Middle-mile, long-haul and data center fiber route design

Outside-plant route design for the fiber that connects networks and data centers, from the Memphis tri-state area outward.

Demand for middle-mile and long-haul fiber is growing faster than any other part of the market, driven by data centers and AI. The Memphis area is part of that story: major data center projects are under way in Memphis, in Southaven, Mississippi, and in West Memphis, Arkansas, all within a short drive of each other and separated by a state line or the Mississippi River.

Route design uses the same disciplines as our distribution work, applied over longer distances: GIS route analysis, field verification, crossing and right-of-way permitting, and construction-ready plan sets.

What's included

Scope

  • Route feasibility

    GIS analysis of candidate routes: distance, right-of-way type, crossings, constructability and permitting risk.

  • Diverse-path analysis

    Physically separate routes checked for shared structures, bridges, crossings and corridors, so that diverse means diverse.

  • Crossings and permitting

    River, rail, levee and highway crossings identified early and permitted through the right authority.

  • Construction plan sets

    Plan and profile drawings, conduit and handhole detail, and material takeoffs.

Local ground

Three states, one river and five railroads

A route between Memphis, Southaven and West Memphis can touch Tennessee, Mississippi and Arkansas permitting, a Mississippi River crossing, federal levees and several Class I railroads. Knowing which of those a candidate route triggers, before it is chosen, is most of the value of a feasibility review.

The region also sits in the New Madrid seismic zone, with Delta alluvial soils and a high water table in many areas. Those conditions bear on boring, vault design and the case for genuinely diverse routes.

An excavated pit in the ballast beside an active rail line as a freight train passes, with an excavator bucket at the edge.

Deliverables

What you receive

Next step

Talk to the people who lead the work

Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.