Utility pole with power and multiple communication attachments, viewed from below.

Service 03 / Make-ready

Make-ready design and pole loading analysis

Make-ready is where aerial fiber schedules slip. We work it out as part of the design, not as paperwork after it.

Across the industry, pole attachment and make-ready work is one of the most common reasons a fiber build starts late. Pole owners are busy, application requirements differ from one owner to the next, and a rejected application costs weeks.

From our digital pole surveys we conduct make-ready design and pole loading analysis and provide clear recommendations, including aerial fallout options, based on each client's cost and lead-time tolerances.

What's included

Scope

  • Make-ready design

    Pole-by-pole calls on what has to move, be replaced or be added for a compliant attachment.

  • Pole loading analysis

    Analysis of each pole with the proposed attachment, run in Katapult unless the pole owner requires other software.

  • Aerial fallout options

    Where a pole or span will not work at a sensible cost or lead time, we show the alternatives: reroute, go underground, or wait.

  • Application packages

    Attachment applications assembled to each pole owner's own format and process.

Approach

Know each pole owner's rules before you survey

An investor-owned utility, a municipal utility, an electric cooperative and a legacy telephone company can all own poles on the same route, and each runs its own application process with its own standards. We identify the owners early and design to their exact specifications.

In the Mid-South that landscape includes municipal systems such as MLGW in Memphis, the local power companies that distribute TVA power, electric cooperatives, Entergy in Arkansas and Mississippi, and AT&T's legacy pole plant. Each is a different conversation.

A newer wooden pole beside an older one, with communication cables on strand, a coil of slack cable and guy hardware on both.

Connected design

Make-ready results change the design, automatically

When make-ready shows that a span should go underground or a route should move, that decision has to reach the design, the drawings, the splice plan and the bill of materials. In our pipeline it does, without a separate round of manual edits.

Pole loading analysis report for a 40-foot class 4 pole: inputs, a 3D load model, a field photo and capacity tables, with identifying details redacted.

Deliverables

What you receive

Questions

Common questions

Can you take make-ready on a build someone else designed?
Yes. Make-ready and pole loading can be scoped on their own. We will need the proposed attachment details and route, and either existing survey data or a survey from us.
Do you work for pole owners as well as attachers?
We are happy to talk with cooperatives and municipal utilities that need help with attachment requests on their own poles.
Do you seal drawings?
No. We do not seal drawings or calculations, and not every permitting authority requires a seal. Where a pole owner, DOT or railroad does, we partner with an engineer licensed in that state or work with your engineer of record.

Next step

Talk to the people who lead the work

Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.