Service areas / Mississippi

Fiber network design and make-ready in Mississippi

Electric cooperative fiber across the state, Delta soils, and DeSoto County next door to Memphis.

Mississippi starts at the Memphis city limits: DeSoto County is part of the metro area and one of the fastest-growing parts of the state. Since state law changed in 2019 to let electric cooperatives offer broadband, co-ops have built fiber across much of rural Mississippi, and that plant now needs extension, make-ready for other attachers, and accurate records.

The Delta brings its own design conditions: flat alluvial ground with a high water table, long aerial spans across farmland, drainage structures and levees.

Flat Mississippi Delta cotton field with a pole line to the horizon.

Mississippi at a glance

What a fiber build here has to account for

BEAD status
NTIA approved Mississippi's BEAD final proposal in early 2026. Funded construction is expected to run through 2028.
State right-of-way
Mississippi Department of Transportation (MDOT).
Pole owners
Electric cooperatives (electric power associations), TVA local power companies in the north, Entergy Mississippi, Mississippi Power in the southeast, and AT&T legacy poles.
Levees and water
Mississippi River levees fall under the U.S. Army Corps of Engineers, Vicksburg and Memphis Districts, with local levee boards alongside.
Terrain
Delta alluvial plain in the west; hills and pine country to the east.

Program information as of September 2026. Pole owners and authorities are listed to describe the landscape, not as clients or endorsements.

Next step

Talk to the people who lead the work

Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.