Service areas / Missouri
Fiber network design and make-ready in Missouri
The Bootheel and southeast Missouri: co-op fiber, drainage districts and New Madrid soils.
Southeast Missouri and the Bootheel are closer to Memphis than to St. Louis or Kansas City. It is cooperative country, flat and agricultural, drained by one of the largest drainage-district systems in the United States.
The Bootheel sits at the center of the New Madrid seismic zone. Soils prone to liquefaction and a high water table bear on how vaults, cabinets and bored crossings are designed.

Missouri at a glance
What a fiber build here has to account for
- BEAD status
- NTIA approved Missouri's BEAD final proposal in early 2026, with a large majority of funded locations to be served by fiber. Construction is expected through 2028.
- State right-of-way
- Missouri Department of Transportation (MoDOT).
- Pole owners
- Electric cooperatives, Ameren Missouri, municipal utilities and legacy telephone company poles.
- Levees and water
- Mississippi River levees and the Bootheel's drainage districts; U.S. Army Corps of Engineers, Memphis District.
- Terrain
- Alluvial lowland in the Bootheel; Ozark hills and rock to the north and west.
Program information as of September 2026. Pole owners and authorities are listed to describe the landscape, not as clients or endorsements.
Services
What we do in Missouri
- FTTH Network DesignFeasibility, HLD, LLD, splice plans, BOM and construction prints.
- Make-Ready Design & Pole LoadingMake-ready calls, pole loading analysis and pole application packages.
- Permitting & Right-of-WayDOT, county, municipal, railroad, river and levee permits, tracked to RTC.
- BEAD & Grant Program SupportPost-award design keyed to committed locations, with reporting from the data.
Next step
Talk to the people who lead the work
Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.