How we work: six steps to ready-to-construct
Every phase feeds the next, so a permit comment or a field surprise updates the design, the drawings and the splice plan together.
-
Step 01
Evaluation
We begin by assessing the feasibility and potential of fiber deployment using GIS-driven analysis and custom autodesign tools, laying a solid, data-backed foundation.
-
Step 02
High-level design
We set a network architecture sized for scalability and reliability. Design changes are automatically validated with custom QC and carried into the full design pipeline.
-
Step 03
Fielding
We perform field surveys on the Katapult platform, capturing real-world conditions to validate design assumptions and prepare for permitting and pole loading analysis.
-
Step 04
Low-level design
Detailed configurations, including fiber assignments, routing and make-ready recommendations, are designed to match permitting requirements, construction realities and your standards.
-
Step 05
Drafting
We draft construction drawings and plan sets in OSPrey, our own design platform, where the drawing and the GIS network model are one record. Revisions flow from design updates, keeping everything aligned. When a client requires AutoCAD Civil 3D, we draft there.
-
Step 06
Permitting
We coordinate with permitting authorities, track revisions, manage submittals across portals and integrate changes back into design, so nothing delays your path to construction.
The RTC runway
Ready-to-construct, earlier, and kept that way
Construction crews are the most expensive part of a fiber build, and the most expensive thing they can do is wait. Our goal on every project is a runway of ready-to-construct (RTC) work ahead of the crews: designed, fielded, drafted and permitted.
On a large build it is easy to lose track of what is actually RTC. We maintain that clarity throughout, build the runway early, and adjust priorities with you as permits and field conditions change.

The revision loop
Changes flow through, instead of being re-entered
Designs change. Value engineering, a permit comment, a pole that cannot take another attachment: each one touches the GIS design, the CAD drawings, the splice plan and the bill of materials.
Because our phases are connected, a redesign flows cleanly through GIS, CAD and splice planning. Every revision and every permit change is integrated back into design, QC and ultimately your system of record.

Tools we work in
- OSPrey, our design platform
- Katapult
- QGIS
- AutoCAD Civil 3D on request
- Custom spatial scripting
- VETRO and OSP Insight migrations
Next step
Talk to the people who lead the work
Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.