Process

How we work: six steps to ready-to-construct

Every phase feeds the next, so a permit comment or a field surprise updates the design, the drawings and the splice plan together.

  1. Step 01

    Evaluation

    We begin by assessing the feasibility and potential of fiber deployment using GIS-driven analysis and custom autodesign tools, laying a solid, data-backed foundation.

  2. Step 02

    High-level design

    We set a network architecture sized for scalability and reliability. Design changes are automatically validated with custom QC and carried into the full design pipeline.

  3. Step 03

    Fielding

    We perform field surveys on the Katapult platform, capturing real-world conditions to validate design assumptions and prepare for permitting and pole loading analysis.

  4. Step 04

    Low-level design

    Detailed configurations, including fiber assignments, routing and make-ready recommendations, are designed to match permitting requirements, construction realities and your standards.

  5. Step 05

    Drafting

    We draft construction drawings and plan sets in OSPrey, our own design platform, where the drawing and the GIS network model are one record. Revisions flow from design updates, keeping everything aligned. When a client requires AutoCAD Civil 3D, we draft there.

  6. Step 06

    Permitting

    We coordinate with permitting authorities, track revisions, manage submittals across portals and integrate changes back into design, so nothing delays your path to construction.

The RTC runway

Ready-to-construct, earlier, and kept that way

Construction crews are the most expensive part of a fiber build, and the most expensive thing they can do is wait. Our goal on every project is a runway of ready-to-construct (RTC) work ahead of the crews: designed, fielded, drafted and permitted.

On a large build it is easy to lose track of what is actually RTC. We maintain that clarity throughout, build the runway early, and adjust priorities with you as permits and field conditions change.

Printed construction plan sheets with a scale ruler and highlighter.

The revision loop

Changes flow through, instead of being re-entered

Designs change. Value engineering, a permit comment, a pole that cannot take another attachment: each one touches the GIS design, the CAD drawings, the splice plan and the bill of materials.

Because our phases are connected, a redesign flows cleanly through GIS, CAD and splice planning. Every revision and every permit change is integrated back into design, QC and ultimately your system of record.

Sample construction plan sheet drawn in OSPrey: a fiber relocation along a highway with bore, pole and splice callouts and a title block.

Tools we work in

  • OSPrey, our design platform
  • Katapult
  • QGIS
  • AutoCAD Civil 3D on request
  • Custom spatial scripting
  • VETRO and OSP Insight migrations

Next step

Talk to the people who lead the work

Tell us what you are building and where it is stuck. You will hear back from Chris or Sarah.